Maze Engineering Solutions
Golden Square
All projects
Maze Engineering·Commercial·London

Golden Square

Value
£2.9m
Year
2023
Duration
Client
Confidential
Overview

CAT A fit out over 9 Floors, plus a roof terrace/bar.

CAT A fit out over 9 Floors, plus a roof terrace/bar. 8 Floors of ceiling mounted fan coils, grill mounted within SAS ceiling tiles and which also contain surface mounted linear light fittings, Each floor has individual MVHR units providing fresh air and extract ventilation to all Floors. Toilet accommodation to all floors together with showers on the Lower Ground Floor, with cycle store. Ground floor consists of a Retail space (Coffee shop) and a shared workspace for visitors as well as a separate entrance for access to the basement cycle store.

The challenge

Working in a sensitive conservation context with strict logistics and noise controls.

The outcome

An EPC-improving refurbishment delivered without disrupting the surrounding street.

Scope of works
  • / CAT A refurbishment
  • / Roof-plant renewal
  • / EPC uplift
Golden Square — image 1
Golden Square — image 2
Golden Square — image 3
Golden Square — image 4
Next project

Capital One

Commercial · London