Maze Engineering·Industrial·Gatwick
Diamond Point
Value
£5.6m
Year
2024
Duration
28 weeks
Client
Confidential
Mechanical Design & Build fit out for the CAE training facility.
Mechanical Design & Build fit out for the CAE training facility. Maze designed optimum chilled water systems to provide critical cooling to Airbus flight simulators.
The challenge
Co-ordinating large-scale plant deliveries and crane lifts within an active airport environment while keeping a tight handover programme on track.
The outcome
A fully commissioned, energy-efficient facility delivered ahead of programme, with resilient standby power and BMS controls tuned for the operator's specific load profile.
Scope of works
- / Industrial MEP
- / Specialist HVAC
- / LV power & controls
- / Standby resilience